Installation of the tanks is possible in an environment without groundwater, and their load is designed for pedestrian traffic.
If it is placed in a groundwater environment, in that case the tanks must be attached to the receiving concrete with straps.
Parameters:
- 50 cm ground cover
- Base material: PP-C, galvanized closed section reinforcement
- Concealed opening DN900
- Product with NMÉ and CE certification
Product accessories:
-Lid with solar level indicator has a lockable design
Shipping information
We deliver with a 3.5-ton pickup truck and an 8.5-meter-long trailer, so the delivery is understood up to the point where we can approach the place with this assembly.
I would like to draw your attention to the fact that our company does not transport its works of art with crane cars, so removing them from the car and lifting them into the work pit is the responsibility of the customer. They can be removed/raised with a crane or a larger earthmoving machine.