An artefact for the pretreatment of waste water coming from a building, it is necessary to lead the pretreated water to the cleaning field. Sludge must be removed once a year. The equipment has a lifting chamber, so it is suitable for installing a pump, so it is not necessary to build a separate lifting shaft for the art object.
Parameters:
- 100 cm ground cover
- Base material: PP-C/PE, stainless closed section reinforcement
- The neck of the tank can be spliced with a heightening element and can be cut to size
- Product with first type inspection
- CE certified product
Product accessories:
-Cover with solar-powered level indicator (for operation control feedback) (The cover cannot be closed by default)
-With inflow and overflow connection spigots welded to the tank wall as shown below
6-10 HP- DN110
15-20 HP - DN125
25-50 HP DN160
Shipping information
The delivery of the ordered product takes place within 10-15 working days from the conclusion of the contract (if any, from the payment of the advance payment), at a pre-arranged time. We would like to draw your attention to the fact that our company does not transport its containers with a crane, so we ask that you kindly help our driver to roll the container.
Information about authorization
We prepare the design documentation within 3-5 working days and send it by mail in 3 copies. In all cases, the administration is the responsibility of the customer, as the property owner can apply for the permit.
Construction can begin in possession of a valid establishment permit. The authorization period takes a maximum of 30 days, if the Clerk also involves specialized authorities, then this time is the administrative time of the specialized authorities may be longer. The authorization the customer is responsible for paying the fees incurred during the procedure. Some areas, the Clerk may request a soil mechanics expert opinion, the preparation of which the cost of the design documentation is not included.
During licensing, the following legislation is taken into account:
If the discharge of purified water exceeds 500 m3/year, or a receiving living water, then a water law licensing procedure must be conducted a at the regionally competent Disaster Management Directorate. For this procedure various environmental impact studies, soil mechanics expert opinions are necessary, in the preparation of which we cannot contribute, but we can recommend planning offices that specialize in water rights permits.
If If you have any questions about this, please contact us at the following contact: